I have begun to see the dreaded stalactites hanging from my keel which I believe to mean the cement is washing away. Three questions:
Is there a stop-gap measure I can use until I absolutely need to dig it out and replace with new "heavy stuff"?
How do I know when it is absolutely time to dig it out and replace with heavy stuff?
Could I cut through the floorboards and make the repair?
Thank you for the combined wisdom of this group!
Scott
Green Bay